Produce

Engineering samples through all the final test, and after a quality service centers and all involved in the project development team recognized only after the formal entry into the production process. But that does not mean the end of quality control work. Monitoring and testing throughout the production process always always ensure quality control to achieve the ultimate goal.

Procurement component quality assurance
Purchases from outside the factory parts to go through Toyooka factory warranty center for testing only after the assembly department consists of warehousing department or reception. If the sample does not meet the procurement component specifications, the entire batch of parts will be returned to the supplier. The phase detector is very strict, the detection range involves coating durability and precision micron diameter tolerances. The following examples.

Haowei Sound Technology Co., Ltd.©Copyright Tel: 020-86448361 26261196 Fax: 020-86448361